Skip to Main Content
Sage Construction Management Ideas Portal
ADD A NEW IDEA

All ideas

Showing 573 of 573

Use field crew to assign scheduling task resources

The ability to utilize the crews created for time tracking in the scheduling function
Guest 6 months ago in Feature Settings / Labor Timecards / Schedules (Gantt Chart) 0 Future consideration

Control who can annotate in document viewer

Be able to control who can annotate drawings, specs, photos, etc in the document viewer.
Jack Speshock 6 months ago in Document Viewer / Linked Files (Projects) / User Security Roles 2 Future consideration

Add permit reference to tests/inspections

On the test and inspection screen add a reference that allows you to select a permit.
Jack Speshock 6 months ago in Quality Control 0 Future consideration

Add To Dos to Active Projects Calendar

It would be really nice to be able to create new To Dos on the general/multi-project calendar. The calendar/to dos would be much more likely to be utilized and effective.
Kenani Brandon 11 months ago in Alerts and Calendars / Project To Do 0 Future consideration

Bookmark name for the Project Page

When bookmarking a project page, by default, make the bookmark name the project name not Sage.
Guest 6 months ago in Projects (Active and Inactive) / UI User Interface Enhancements 0 Future consideration

Add bookmarks that break out change order additions and deductions for prime invoices

Need bookmarks that would be able to populate these fields on a g702 like document.
Jack Speshock 6 months ago in Reporting / Analytics 0 Future consideration

ASI's and CB's

Can a section be added for either an ASI (Architect's Supplemental Instruction) or a CB (Construction Bulletin)? We get these often and need a place to upload them for all project vendors/owners/architects to see at all times.
Guest 6 months ago in Documentation 4 Future consideration

Turn off Auto Lock Feature for CO and Subcontracts

Our change orders and subcontracts have started auto locking after the sub signs the contract. Is there a way to turn off this auto lock feature?
Jen Marucci 6 months ago in Prime Contracts / Subcontracts 3 Future consideration

Quotation / Leads 30 day terms

There is no where in the leads matrix to provide a 30 day expiry terms for the validity of lead. currently we have to manually enter the date within the lead from the date of the lead produced to notify our customer that the date of the lead is on...
Guest 6 months ago in Leads (Active or Intactive) 1 Already exists

Automatic closing of Work Orders

It would be helpful that when an invoice is entered from a Work Order if it automatically closed and locked the work order. Or at least have this as an option in set-up.
Gaylene Underwood 6 months ago in Prime Invoices / Work Orders 1 Future consideration