Skip to Main Content
Sage Construction Management Ideas Portal
ADD A NEW IDEA

Prime Contract Setup Wizards (Includes Project Setup Wizard)

Showing 6 of 585

Only allow estimates with an "approved" status to be added to prime contract

This idea would ideally build upon idea "SAGECM-I-33". Currently, an estimate with any status, including draft, may be added to a prime contract. Ideally, an estimate would undergo a review/approval via a system-defined workflow. Per "SAGECM-I-33"...

Add Project Specific Locations for job cost reporting purposes

Currently, project specific locations can be used on an estimate only. However, it would be nice to copy these locations to the project side via the contract admin setup wizard. This would facilitate a new set of job cost reports by location.

Change setting Specify Contacts for Project once created

Once you have created a Project and selected the "Specify Contacts for Project" and therefore "Show Only Specified Contacts on Add/Edit Forms" you can no longer change that setting (and you can't even see how it is set). So if you missed setting t...
Tim Smith 8 months ago in Contacts / Prime Contract Setup Wizards (Includes Project Setup Wizard) / Project Directory 0 Future consideration

Include Checklist Templates in Lead/Project Wizard

We have elected to utilize "Checklists" to assist with internal workflow. We have created a checklist template for leads and estimates which includes the steps of our internal workflow. In creating a Lead, we add the checklist template to the lead...

Update estimate within a Prime Contract without having to delete the Prime Contract

You create a Prime Contract, bring an estimate into it. Then the estimate changes and you CAN NOT bring it back into the same Prime Contract (does not refreshes the previous). The only solution is to delete the Prime Contract and do it all again. ...
Gilbert Sanchez 4 months ago in Prime Contract Setup Wizards (Includes Project Setup Wizard) / Prime Contracts 0 Future consideration

Ability to Add SOV that is seperate from job cost codes

Most of our customers are not able to tie thier internal cost codes to owner cost codes in a 1:1 or Many:1 relationship. They would like the ability to enter a SOV that is totally seperate from their job cost codes.
Jack Speshock 7 months ago in Prime Contract Setup Wizards (Includes Project Setup Wizard) / Prime Contracts / Prime Invoices 1 Future consideration