Change default templates to custom templates

When selecting the template on a PO, Subcontract, etc., many times this is customized to client specifications. It would be great if there was a way to change the default to these custom templates, so that when user selects the Report, their custo...
Jo Steiner 11 months ago in Detail Report Templates / UI User Interface Navigation 6 Future consideration

CTRL + Clicking a Hyperlink To Open Item In New Window

Being able to open, for example, a submittal package and having it open in a new tab by CTRL + clicking would be very useful for multitasking and organizational purposes. Currently after clicking on a submittal, you can only press the back button ...
Guest 6 months ago in Submittals / UI User Interface Enhancements / UI User Interface Navigation 2 Future consideration

In Multi Project Gantt View, make the Projects and schedules links that bring you directly to it when clicked

For efficiency making the projects and schedule listed in multi project Gantt view clickable links to the actual schedules would remove a lot of additional clicks to get back into the project schedule when you just want to see more details about a...
Guest about 2 months ago in Schedules (Gantt Chart) / UI User Interface Navigation 0 Future consideration

Recently Viewed or Recently Opened

I would like to see a tab or button that would allow me to return to a recently worked on page. Every similar system I have ever used has some sort of working history that allows you to jump right back into a page you were recently working on. I o...
Case Downs about 2 months ago in UI User Interface Enhancements / UI User Interface Navigation 1 Future consideration

List views column width

On the list views it would be nice to be able to control column widths to make things list better and be more readable. e.g per attached make the supplier and subject columns wider and project contract and totals narrower Or make the columns width...
Tim Smith over 1 year ago in UI User Interface Enhancements / UI User Interface Navigation 0 Future consideration

Multi Schedule view has Prime Schedules list under Job Side Bar instead of Columns

Having Prime start and finish dates list under the Project side bar, to populate in the Gantt Multi Project Schedule view, would be much more beneficial for comparison use than the current columns to the right. You do not get the visual of the sch...
Guest about 2 months ago in Schedules (Gantt Chart) / UI User Interface Navigation 3 Already exists

Copy Bill with attachment to PO

It would be very helpful that when you hit "Copy Bill" that it attaches to the same PO and cost codes so that the bill can be a copy of the previous bill.
Megan Zwart about 2 months ago in Purchase Orders / UI User Interface Enhancements / UI User Interface Navigation / Vendor Bills 2 Needs review

Freeze Pane

When entering items into an estimate the top row should be frozen so if you are adding a lot then you can still see where M L S and O are.
Guest 3 months ago in UI User Interface Enhancements / UI User Interface Navigation 0 Future consideration

Submittal - Edit and change Respondence after created.

When in submittals there is a editable field under 'Respondence' but its useless when it comes to editing the contact or changing email addresses or in my case I forgot to add the contact/email address now I don't have a chance to change it withou...
Jessica Carbone 5 months ago in Submittals / UI User Interface Navigation 0 Future consideration

System setting to default "Enable Locations" on estiamtes

The current default for "enable locations" is unchecked when creating estimates. For businesses that will consistently utilize the "Enable locations" feature, it would be desirable to have a company setting that would allow for "enable locations" ...
Carl Lyles 11 months ago in Locations / UI User Interface Navigation 0 Future consideration