Showing 48 of 713

Interim Prime Contract Status Between Approved and Approved and Closed

When a project is completed and pending final closure, additional cost and time may not want to be added to the project/prime contract. Interim codes such as Pending Close and Approved for Close on prime contracts would have the properties that do...
Dawn Parents about 1 year ago in Prime Contracts 0 Future consideration

Add Classification to Prime Contracts

We need to be able to add Classification to Prime Contracts in order to Map the different income accounts within the same Project. Is there any way to get back to me to see if this is feasible in the near future? We we're hoping to get this done i...
Guest 7 months ago in Feature Settings / Prime Contracts / Projects (Active and Inactive) 0 Future consideration

Prime Contract Invoice Combine CO Items with matching SOV Items

On the Prime Contract Invoice Wizard - Select Add Item Details Method; it would be helpful to have an option that combines the CO item with the original SOV. Essentially just increasing the SOV line rather than billing separate or on separate lines.
Sondra Hall 11 months ago in Prime Contracts / Prime Invoices 0 Future consideration

Prime Contract Budget Revisions when integrating with Sage 100 Contractor

It would be very useful to be able to revise a Budget prime contract in Sage CM and have those changes post to Sage 100 Contractor.
Jesse Gordon 8 months ago in Accounting Link for Sage 100 Contractor / Prime Contracts 0 Future consideration

Prime Contract Budget Revisions when integrating with Sage 300 CRE

It would be very useful to be able to revise a Budget prime contract in Sage CM and have those changes post to Sage 300 CRE.
Jesse Gordon 8 months ago in Accounting Link for Sage 300 CRE / Prime Contracts 0 Future consideration

Prime Contracts

Combine Lump Sump and Cost Plus items on the same Prime Contract
Gilbert Sanchez 8 months ago in Prime Contracts 1 Future consideration

Add Option to Create CO and Create Prime Invoice from Actions when in Prime Contract

It would enhance the UI if when in the Prime Contract to have the ability to navigate to add change order (Add CO) or create prime invoice from the Actions drop down. This would streamline the flow and add a smoother flow and less navigation clicks.
Dawn Parents 8 months ago in CO / Prime Contracts 0 Future consideration

Cost plus without GMP Contract has Cost Summary Breakdown

The cost plus with GMP has a nice simple breakdown of cost budgets by resource. Hoping same thing could be added to cost plus without GMP
Tim Smith about 1 year ago in Cost Plus Without GMP / Prime Contracts / UI User Interface Enhancements 4 Future consideration

Use Locations for Work Orders and Cost

Currently Locations are only available for use on the client side. It would be beneficial to be able to have the Locations field populate on the cost side such as work orders, subcontracts, reports, etc. The time it would save to pop in a location...
Dawn Parents 9 months ago in Prime Contracts / Purchase Orders / Subcontracts / Work Orders 0 Future consideration

Ability to Add SOV that is seperate from job cost codes

Most of our customers are not able to tie thier internal cost codes to owner cost codes in a 1:1 or Many:1 relationship. They would like the ability to enter a SOV that is totally seperate from their job cost codes.
Jack Speshock 11 months ago in Prime Contract Setup Wizards (Includes Project Setup Wizard) / Prime Contracts / Prime Invoices 1 Future consideration