Skip to Main Content
Sage Construction Management Ideas Portal
ADD A NEW IDEA

Projects

Showing 85 of 714

Send RFI, Instruction from Project Groups

Having the Project team groups as an option in the contact list for a project so we can send all correspondence to a Project team group instead of induvial clicking them or a separate message for each contractor . e.g. RFI's, Transmittal, issues,
Brendon Rohde about 1 year ago in Project Groups / RFI 0 Future consideration

Dynamic Filtering of Active Leads & Projects

In setting access to a user's Leads & Projects, it would be desirable to have dynamic filters applied so that the system automatically added leads and projects based upon the filter criteria selected. The goal would be to eliminate the need to...
Carl Lyles 8 months ago in Leads (Active or Intactive) / Projects (Active and Inactive) / User Properties / User Security Roles 2 Future consideration

Change setting Specify Contacts for Project once created

Once you have created a Project and selected the "Specify Contacts for Project" and therefore "Show Only Specified Contacts on Add/Edit Forms" you can no longer change that setting (and you can't even see how it is set). So if you missed setting t...
Tim Smith 11 months ago in Contacts / Prime Contract Setup Wizards (Includes Project Setup Wizard) / Project Directory 0 Future consideration

Organize Drawing by Area

My projects have multiple area's under the same contract. For example Building 1 , Building 2, Civil, & City improvements. Right now there is no way to create a sub folder under drawings (at least that I can see). So when I open my drawings al...
Preston Sciarrillo 4 months ago in Drawings / Drawings, Specifications & ITBs / Linked Files (Projects) 0 Future consideration

Custom Fields - Companies, Contacts, Leads, Projects, Prime Contracts, and Subcontracts

It would be really helpful to be able to add custom fields to leads/projects records to hold information that is not in the system out of the box. For example, maybe we need to specify a gate code for a project address so that we can make it to th...

Insurance for Architects & Engineers

Architects and Engineers are not required to provide insurance to us, but they will show up as "without insurance on active projects". Is it planned to create a check box to say someone does not require insurance, so they will not show up in that ...
Molly Toledo 10 months ago in Projects 1 Future consideration

PROPOSED STOCK LOG REPORT: Be able to print an entire project directory with: Company Name, Contact Name, Phone Number, Type (cell, office, etc.) and email address of every contact on the project without having to look them up individually.

Why is it useful? Can you imagine printing every individual sub out, one at a time, on individual pages? No, we need a simple complete list. It should also be able to include permit numbers and inspection request phone numbers.
Guest 2 months ago in Log Style Reports / Project Directory 1 Future consideration

Add ability to add backup to esign documents

When sending an estimate via e-sign feature it would be nice if you could attached supporting documents if needed.
Guest 11 months ago in eSign (including DocuSign) / Linked Files (Projects) 0 Future consideration

Granting Time Approval Access by Utilizing Project Manager Assigned to the Project

In lieu of granting time approval access to a company contact through the User in the Company Settings, it would be useful if the Project Manager listed on the Project was automatically granted time approval access to any Company Contacts added to...
Adam Clark about 1 year ago in Clock-In / Clock-Out / Labor Timecards / Projects (Active and Inactive) / User Properties 0 Future consideration

Increase size and storage capacity in photos

Please consider increasing the size and storage for uploading photos.
Micah Will 3 months ago in Documentation / Linked Files (Projects) / Photos 0 Future consideration