Skip to Main Content
Sage Construction Management Ideas Portal
ADD A NEW IDEA

Projects

Showing 95 of 808

Download All Sub Invoice Pencil Draws At One Time

We are needing the ability to download all sub invoice pencil draws that the GC created at one time in order to genterate a pay app package for the bank. It is currently taking to long to go into each sub invoice and generate report and download t...
Guest 11 months ago in Drawings / Linked Files (Projects) / Subcontract Invoices / Teamlink Portal (General) 0 Future consideration

Sort by Record Number in link existing files

No description provided
Guest 4 months ago in Linked Files (Projects) 1 Already exists

Project team view in team links needs to show e-mail address

No description provided
Guest about 1 year ago in Contacts / Project Directory 1 Future consideration

allow correspondece to attach link w/o extra step

currently in order to link a journal, RFI or submittal record it would first have to be saved as a PDF/DOC linked file. If that record was auto saved as a linkable file it could remove this extra step
Guest about 1 year ago in Journals / Linked Files (Projects) / RFI / Submittals 0 Future consideration

Add project directory to favorites

Project directory is not available to be added as a favorite
Jack Speshock about 1 year ago in Project Directory / User Properties 0 Future consideration

Unarchiving Leads and Projects

Is there a way to unarchive a lead (or project) from the "Lead Home" (or "Project Home)"page? Currently leads and projects appear to be only unarchivable by unchecking the box on the "Leads" or "Projects" page. In the past there used to be a check...
Michael Miller about 1 year ago in Leads (Active or Intactive) / Projects (Active and Inactive) 0 Future consideration

Project Titles Need to be more than 20 characters

When creating a project in SCM, have the ability to have project titles that are longer than 20 characters. Sage Intacct allows up to 40 characters
Shon Stefan 11 months ago in Projects (Active and Inactive) 1 Already exists

Add Classification to Prime Contracts

We need to be able to add Classification to Prime Contracts in order to Map the different income accounts within the same Project. Is there any way to get back to me to see if this is feasible in the near future? We we're hoping to get this done i...
Guest 11 months ago in Feature Settings / Prime Contracts / Projects (Active and Inactive) 0 Future consideration

"Smart" Estimated Finish Date Calendar

This would benefit any user that is entering start/finish dates in any section of Sage that utilizes the calendars, and would improve user efficiency. When an Est. Start Date is selected several months in the future, the calendar for the Est. Fini...
Jessica Whyde over 1 year ago in Alerts and Calendars / Projects (Active and Inactive) 0 Future consideration

Copy Project Wizard

Required Selection: Customer Copy Wizard Steps: Project Directory Drawings including files (Source and Target Project files would be separate.) Specifications including files Cost Codes Prime Contract (Customer would be replaced with selection abo...
Norman Wendl 11 months ago in Leads (Active or Intactive) / Projects (Active and Inactive) / UI User Interface Enhancements 0 Future consideration