Skip to Main Content
Sage Construction Management Ideas Portal
ADD A NEW IDEA

All ideas

Showing 771 of 771

Add Warning Banner When Viewing a Drawing's Previous Version

A warning banner should be shown while viewing a drawing's prior version, so you know you are not looking at the latest version of a drawing
Guest over 1 year ago in Drawings 0 Future consideration

Simplify and enhance the process of revising prime contracts when integrated with SIC

Ideally, the locking/unlocking of prime contracts would be permissions controlled. Once unlocked, the user should be able to edit the prime contract estimate, revenue, cost codes, etc. To best manage editing of prime contract estimates, cost codes...
Carl Lyles 7 months ago in Contracts and Procurement Workflow / Prime Contracts 0 Future consideration

Custom Fields - Companies, Contacts, Leads, Projects, Prime Contracts, and Subcontracts

It would be really helpful to be able to add custom fields to leads/projects records to hold information that is not in the system out of the box. For example, maybe we need to specify a gate code for a project address so that we can make it to th...

Send RFI, Instruction from Project Groups

Having the Project team groups as an option in the contact list for a project so we can send all correspondence to a Project team group instead of induvial clicking them or a separate message for each contractor . e.g. RFI's, Transmittal, issues,
Brendon Rohde about 1 year ago in Project Groups / RFI 0 Future consideration

Freeze Pane

When entering items into an estimate the top row should be frozen so if you are adding a lot then you can still see where M L S and O are.
Guest 3 months ago in UI User Interface Enhancements / UI User Interface Navigation 0 Future consideration

Manually Type Cost Codes

It would be nice to be able to type the cost code number so you can continue tabbing across and not have to use the drop box and scroll through a small box
Guest 3 months ago in Job Cost Codes 6 Already exists

OCR Scan Count (Remaining Scans Allowed for the Month)

It would be helpful for Clients to see where they stand on their allowable OCR scans in the settings area.
Adam Clark 8 months ago in Company Settings / OCR 0 Future consideration

Ability to create Change Orders of a different Contract Type than Prime Contract

It is very common in our industry for change orders to have a different contract type than the prime contract. For example, a project may be initiated from an estimate as a fixed lump sum contract. As the project progresses, a change order may ini...
Carl Lyles 8 months ago in CO 9 Future consideration

Add a lead without a company

Contractors in the residential market dont necessarily use companies as their client, it would be directly to a person or homeowner in most cases.
Guest 3 months ago in Lead Setup Wizard 0 Future consideration

Add a total line to the item entry window in the estimating module.

I would like to see the total of the item I am entering on the same screen as I am entering the numbers in. Simple one line add for total item costs.
Ben Walters 3 months ago in Estimating Items / Work Items 1 Future consideration