Skip to Main Content
Sage Construction Management Ideas Portal
ADD A NEW IDEA

Job Cost Codes

Showing 2

Manually Type Cost Codes

It would be nice to be able to type the cost code number so you can continue tabbing across and not have to use the drop box and scroll through a small box
Guest about 1 month ago in Job Cost Codes 5 Already exists

Auto Tagging Parent Cost Code when Child Cost Code is checked

Clients are requesting that when adding in Cost Codes in the system that when a user clicks on the child parent it auto selects the parent, rather than having to tag both. Should be a one to one relationship rather than the system allowing a child...
Guest about 1 month ago in Estimate Cost Codes (WBS) / Job Cost Codes 1 Already exists