Setting for Labour role on timesheet only changes billable rate

When add a labour role to a timesheet could there be a setting so this only changes the timecards billable rate and therefore costs will only come from the employess HR settings. When someone can be billed out as different roles doesn't mean their...
Tim Smith 11 months ago in Feature Settings / Labor / Craft Codes / Labor Timecards 0 Future consideration

The "issue add" option should be available in TeamLink for subcontractor, owners, and architects to be able to use.

No description provided
Guest 11 months ago in TeamLink Portal 0 Future consideration

Project Durations

Prospect requested that project durations can be linked to individual line items in an estimate so that estimate durations can be changed in bulk.
Sue Parker 11 months ago in Alerts and Calendars / Estimating Items / Work Items 0 Future consideration

Set default filters in mobile app

Currently when viewing lists in the sage cm mobile app, the filter defaults to Current Project - Open - My Items (for punchlist items). Users want the option to change these to default to Current Project - All
Jack Speshock 11 months ago in Mobile - Android / Mobile - Apple / Projects (Active and Inactive) 0 Future consideration

Set default workflow type for RFI's

Have the ability in feature settings to set a default workflow type for RFI's
Jack Speshock 11 months ago in Feature Settings / RFI 0 Future consideration

Autodesk Revit File Viewer

When we upload an Autodesk Revit RVT file, we want to be able to see it in the preview.
Guest 12 months ago in Drawings, Specifications & ITBs 1 Future consideration

Picture Quality

It would be nice to have the option in the Contract Management App to not reduce the picture quality when taking a picture from inside the app.
Guest 12 months ago in Photos 0 Future consideration

Show release date on drawing revision details screen

On the drawing revision details screen add a column for release date
Jack Speshock 12 months ago in Drawings, Specifications & ITBs 2 Future consideration

Change order (Variation) Cost plus type - track previously imported items

When you import associated cost to date (or committed costs) to a Change Order then each time you run the import it adds all associated items even if they were previously imported to the CO causing double ups that you then need to find and delete....
Tim Smith 12 months ago in CO 0 Future consideration

Add permit reference to tests/inspections

On the test and inspection screen add a reference that allows you to select a permit.
Jack Speshock 12 months ago in Quality Control 0 Future consideration