Skip to Main Content
Sage Construction Management Ideas Portal
ADD A NEW IDEA

All ideas

Showing 617

Cost code filter

inquiring about a filtered cost code search for codes that have been specifically tagged to PO's, SCO, etc.. similarly to the way we can filter within a PO's to narrow a search from within that window.
Guest 9 months ago in Job Cost Codes 1 Future consideration

Add Option to Create SCO and Create Sub Invoice from Actions when in Subcontract

It would streamline the UI experience if when in a subcontract you can go to Actions and have the ability to Create SCO or Create Invoice from the dropdown. It would smooth the transition and eliminate unnecessary clicks.
Dawn Parents 9 months ago in UI User Interface Enhancements 0 Future consideration

Additions /Changes to Subcontract Status Types

It would be beneficial to either be able to customize or pick from preselected options that are more descriptive. For example, pending is very vague and doesn't give enough detail as to what is pending. A contract admin should be able to produce a...
Guest 9 months ago in Feature Settings / Log Style Reports 2 Future consideration

Setting for Labour role on timesheet only changes billable rate

When add a labour role to a timesheet could there be a setting so this only changes the timecards billable rate and therefore costs will only come from the employess HR settings. When someone can be billed out as different roles doesn't mean their...
Tim Smith 9 months ago in Feature Settings / Labor / Craft Codes / Labor Timecards 0 Future consideration

The "issue add" option should be available in TeamLink for subcontractor, owners, and architects to be able to use.

No description provided
Guest 9 months ago in TeamLink Portal 0 Future consideration

Project Durations

Prospect requested that project durations can be linked to individual line items in an estimate so that estimate durations can be changed in bulk.
Sue Parker 10 months ago in Alerts and Calendars / Estimating Items / Work Items 0 Future consideration

Cross Project Reports for Clock In Clock Out Data -Total by Hours

The Cross Project reports for clock in and clock out data total by minutes. Very confusing. How about totaling by hours?
Annie Kendrick 10 months ago in HR, Time, and Expenses 0 Future consideration

Set default filters in mobile app

Currently when viewing lists in the sage cm mobile app, the filter defaults to Current Project - Open - My Items (for punchlist items). Users want the option to change these to default to Current Project - All
Jack Speshock 10 months ago in Mobile - Android / Mobile - Apple / Projects (Active and Inactive) 0 Future consideration

Set default workflow type for RFI's

Have the ability in feature settings to set a default workflow type for RFI's
Jack Speshock 10 months ago in Feature Settings / RFI 0 Future consideration

Autodesk Revit File Viewer

When we upload an Autodesk Revit RVT file, we want to be able to see it in the preview.
Guest 10 months ago in Drawings, Specifications & ITBs 1 Future consideration