Set default workflow type for RFI's

Have the ability in feature settings to set a default workflow type for RFI's
Jack Speshock 5 months ago in Feature Settings / RFI 0 Future consideration

Create a CPR, CO, or SCO from an Correspondence > Issue

Issues have an Financial Impact field that acts as an estimate or sorts. This could easily convert to a CPR, CO, or SCO. This would also provide a continuous connection to supporting correspondence and documentation for the CPR, CO or SCO.
David Holler 10 months ago in Issues 0 Future consideration

Autodesk Revit File Viewer

When we upload an Autodesk Revit RVT file, we want to be able to see it in the preview.
Guest 5 months ago in Drawings, Specifications & ITBs 1 Future consideration

Picture Quality

It would be nice to have the option in the Contract Management App to not reduce the picture quality when taking a picture from inside the app.
Guest 5 months ago in Photos 0 Future consideration

Show release date on drawing revision details screen

On the drawing revision details screen add a column for release date
Jack Speshock 6 months ago in Drawings, Specifications & ITBs 2 Future consideration

Change order (Variation) Cost plus type - track previously imported items

When you import associated cost to date (or committed costs) to a Change Order then each time you run the import it adds all associated items even if they were previously imported to the CO causing double ups that you then need to find and delete....
Tim Smith 6 months ago in CO 0 Future consideration

Add To Dos to Active Projects Calendar

It would be really nice to be able to create new To Dos on the general/multi-project calendar. The calendar/to dos would be much more likely to be utilized and effective.
Kenani Brandon 11 months ago in Alerts and Calendars / Project To Do 0 Future consideration

Use field crew to assign scheduling task resources

The ability to utilize the crews created for time tracking in the scheduling function
Guest 6 months ago in Feature Settings / Labor Timecards / Schedules (Gantt Chart) 0 Future consideration

Control who can annotate in document viewer

Be able to control who can annotate drawings, specs, photos, etc in the document viewer.
Jack Speshock 6 months ago in Document Viewer / Linked Files (Projects) / User Security Roles 2 Future consideration

Add permit reference to tests/inspections

On the test and inspection screen add a reference that allows you to select a permit.
Jack Speshock 6 months ago in Quality Control 0 Future consideration