New Wizard to notify external team members about Drawing and Specification Revisions using the Journals feature

Wizard Steps: Enter Email Subject and select Journal Type (eg. Drawing Rev Notification) Select one or more drawing files (eg. PDFs) Select one or more specification files (eg. PDFs) Select one or more recipients using Lead Directory, ITB Director...
Norman Wendl about 1 year ago in Alerts and Calendars / Drawings / Lead Directory / Notifications / Project Directory / Specifications 0 Future consideration

Subcontractor and Supplier Performance Reviews

Ability to document performance reviews for subcontractors and suppliers listed in the Project Directory. This information could also be used as a filter criteria when adding vendors to an ITB.
Norman Wendl about 1 year ago in Companies / Compliance / Custom Definable Entry Screens / ITB (Invitation to Bid) 4 Future consideration

Have project to dos assigned to company show up for all users in their multi-project calendar

Based on support ticket I submitted - photos for extra context available here : #29521 I can create project to dos that are assigned to my own company via the teamlink option, and this will make it so that those project to dos show up in the emplo...
Sean Coffman 9 months ago in Alerts and Calendars / Project To Do / Teamlink Portal (General) / Teamlink User Roles 3 Future consideration

Ability to utilize the value entered in the "quantity" field in Work Assembly formulas

When adding a work assembly to an estimate, there is a "quantity" field (see attached photo). Having the ability to extract the value entered in this field for use in Work Assembly formulas would be immensely useful.
Carl Lyles 9 months ago in Estimating Items / Work Assemblies / Work Items 3 Future consideration

Unable to Delete Cost Code when Employee Clocked in using that cost code

When helping customers clean up their cost codes lists after implementation, we ran into an issue trying to delete a cost code from the project. If an employee has clocked in using that cost code, we have no way to delete the cost code until the e...
Bryan Shirota 5 months ago in Clock-In / Clock-Out / Job Cost Codes 0 Future consideration

Internal Notes to All Modules

As teams grow, divisions grow and we are working remotely, it is helpful to be able to leave internal notes at every step of the way. Having an Internal Notes section in every module would allow improved communication.
Victoria Edenfield Hurd 5 months ago in Correspondence / UI User Interface Enhancements 0 Future consideration

Upload updated Word and Email templates instead of having to delete and redo

Any time you update a template you have to delete the existing one and upload a new one where you have to rechoose the Feature and redo the name of the template. It can become quite time consuming where it might just be a small update to the templ...
Tim Smith 9 months ago in Detail Report Templates / UI User Interface Enhancements 1 Future consideration

Import Multiple Change Orders simultaneously from a single Excel Import Template

Please allow for an option to import from excel under the "Change Order" Module. This would save us significant amount of time instead of manually adding each item. The import file could be identical to a Prime Contract Import from excel.
Jake Nelson about 1 year ago in CO / Importing Excel Templates 4 Future consideration

Automatically separate drawing PDF into separate sheets with hyperlinked log

Hello. It is important to track changes to each drawing as they may get changed one at a time or several at a time, or all so history and the current version are both accessible. A self-generating log with hyperlinks would be a great accompaniment...
Guest about 1 year ago in Drawings, Specifications & ITBs 0 Future consideration

Ability to group Purchase Order Line items and Subcontract line items

When entering Purchase order line items or Subcontract line items, it will be usefull to allow grouping of Items. As an example: GROUND FLOOR Rough In; Qty = 1; LumpSum; $100,000; Tax Code Finish; Qty = 1; Lumpsum; $50,000; Tax Code FIRST FLOOR Ro...
Shiva Muthuswamy about 1 year ago in Feature Settings / Purchase Orders / Subcontracts 0 Future consideration