Skip to Main Content
Sage Construction Management Ideas Portal
ADD A NEW IDEA

Projects

Showing 98

Sort by Record Number in link existing files

No description provided
Guest 6 months ago in Linked Files (Projects) 1 Already exists

Rename fields

Some companies do not use sales contacts and would like to repurpose the field as a way to track the superintendent on the job. Another use for this would be to rename a date field to have another use.

"Smart" Estimated Finish Date Calendar

This would benefit any user that is entering start/finish dates in any section of Sage that utilizes the calendars, and would improve user efficiency. When an Est. Start Date is selected several months in the future, the calendar for the Est. Fini...
Jessica Whyde over 1 year ago in Alerts and Calendars / Projects (Active and Inactive) 0 Future consideration

Project Titles Need to be more than 20 characters

When creating a project in SCM, have the ability to have project titles that are longer than 20 characters. Sage Intacct allows up to 40 characters
Shon Stefan about 1 year ago in Projects (Active and Inactive) 1 Already exists

Add Classification to Prime Contracts

We need to be able to add Classification to Prime Contracts in order to Map the different income accounts within the same Project. Is there any way to get back to me to see if this is feasible in the near future? We we're hoping to get this done i...
Guest about 1 year ago in Feature Settings / Prime Contracts / Projects (Active and Inactive) 0 Future consideration

Copy Project Wizard

Required Selection: Customer Copy Wizard Steps: Project Directory Drawings including files (Source and Target Project files would be separate.) Specifications including files Cost Codes Prime Contract (Customer would be replaced with selection abo...
Norman Wendl about 1 year ago in Leads (Active or Intactive) / Projects (Active and Inactive) / UI User Interface Enhancements 0 Future consideration

Timesheet Employee Drop Down Filter by Project

We have several clients with thousands of field employees that need timesheet entry and they would really like to be able to set the Employee drop down to only pull the names of people from their company that are in the project Directory. They jus...
Guest about 1 year ago in Labor Timecards / Project Directory 0 Future consideration

Easy way to print all linked files on a transaction

A quick and easy way to print out all the linked files on a transaction. Use case: Customer wants to print out submittal package that includes product documentation, product photos and design plan that was uploaded to linked files on submittal. In...
Jack Speshock about 1 year ago in Linked Files (Projects) 0 Future consideration

Control who can annotate in document viewer

Be able to control who can annotate drawings, specs, photos, etc in the document viewer.
Jack Speshock about 1 year ago in Document Viewer / Linked Files (Projects) / User Security Roles 2 Future consideration

Make project groups able to to be copied from a different project

No description provided
Guest 8 months ago in Correspondence / Project Directory / Project Groups 0 Future consideration