Skip to Main Content
Sage Construction Management Ideas Portal
Status Future consideration
Created by Ben Walters
Created on Mar 14, 2025

Cost code to premade item list

Could you code a simple option on the items tab to make an item out of every cost code selected for the estimate?

Currently you have to manualy choose each one to create the item list. Most estimates are 70+ items long. you could save us so much time.

  • Attach files
  • Admin
    David Holler
    Reply
    |
    Mar 21, 2025

    Ben, I encourage you to take a look at the Cost Database > Work Items features. If every work item is assigned to at least one default cost code, you will appreciate the Leads/Estimating module so much more.