Issue a credit against a Subcontract/ PO line item

Issue:

  • Client is being issued a credit from a subcontractor after line has been billed 100%

  • Intacct will not allow you to input a negative value against a positive line item (for the credit)

    • Since SCM combines all cost codes during the sync, we cannot create a credit line like we would in Intacct

    • Since SCM does not have the ability to flag an item for “conversion reversal” we also cannot issue a credit to the line directly

Potential fixes/ remedy for the Subcontract credit issue between SCM – SIC:

  • If the integration allowed for the creation of multiple lines using the same cost code

    • including the addition of lines via a SCO

  • Enabling a field within SCM that could map to the “conversion reversal” checkbox on the line

    • This would depend conversion reversal being enabled in Intacct’s Purchasing configuration.